Check and sign off the quote¶
Check every line of the draft, adjust prices and discounts, then sign it off so it can go to the customer.
Who can use this: owners and estimators. Both can edit and sign off a quote.
You have the final say on prices
QuoteSite drafts the quote, but it can get things wrong, including prices. Check every line, quantity and price before you sign off. Nothing can go to the customer until someone ticks the sign-off box.
What's on the screen¶
The top of the quote shows the job reference, the client, the quote's status and the site address. Next to them:
| Button | What it does |
|---|---|
| Preview proposal | Opens the proposal. Greyed out until the quote is signed off. |
| Refine with AI | A short chat that checks the quote with you. Greyed out once it's signed off. |
| Bin | Deletes the whole job. See Delete a job. |
Below that:
| Part | What it's for |
|---|---|
| Survey source | Tap to see the photos, voice memos, transcript and Owner's note from the survey. Tap a photo to see it full size. |
| The lines | Grouped into Materials, Labour and Machinery & site, each with its own subtotal |
| Totals | Subtotal, any Discount, VAT (20%) and Total |
| Margin | Your cost, profit, markup and margin, and the markup slider. Marked Your view only: the customer never sees it. |
| Proposal display | How prices show on this quote's proposal |
| Review & approve | The sign-off box |
| Job lifecycle | Won, lost and done. Appears once the quote has been sent. |
On a phone and a portrait tablet the cards sit under the lines. On a wide screen they're on the right.
Lines to look at first¶
- Lines marked No rate on file · priced manually (with an amber background) aren't on your rate card. Check their price carefully.
- If the Margin card says Margin is below your 25% threshold (or whatever figure you set), look again at the prices. You set the figure in Settings.
- A line's note, if it has one, shows in small text under its name.
Edit a line¶
- Tap the pencil on the line.
- Change what you need:
- The name.
- The group (Materials, Labour or Machinery & site).
- The quantity. Lines from your rate card show their unit, such as m² or each, next to the box, so you only type the number.
- The rate. This box only shows on a tablet or computer.
- The amount. It works itself out as quantity × rate, but you can type over it.
- Internal note: a note for you. It isn't shown on the proposal.
- Markup: shown for lines with a cost. Type the markup you want on top of the cost and the price changes to match.
- Each change saves when you tap away from the box.
- Tap Done.
To remove a line, tap its bin, then Remove line to confirm. Cancel keeps it.
Save a line to your rate card¶
A line marked No rate on file · priced manually isn't on your rate card, so you've priced it by hand. Price it once, and keep it: with the line open for editing, tap Add to my rate card. The item goes on your rate card under Added from quotes, with the unit from the line's quantity (3 tonne saves a per-tonne item) and your figure per unit. The next survey that mentions it is priced from your rate card automatically.
A couple of things it needs from the line first:
- A quantity with a number and a unit, such as 3 tonne or 16 m² — that's where the card item's unit and per-unit figure come from.
- If your prices are worked out from your costs, the line needs your cost (in the line's Margin box) — your rate card prices from costs.
You can move the item to another category, or change it, on the rate card. If your rate card already has an item with the same name, the quote says so instead of adding it again.
Add a line¶
- Tap Add a line under the lines.
- Choose From rate card or Custom line, then follow the steps below.
Tap Cancel to close it without adding anything.
From your rate card¶
- Search by name, supplier or category.
- Tap the item. Its group, unit and price show at the top. Tap Change to pick a different one.
- Enter the Quantity.
- Check the Group. It's chosen for you from the item's category.
- Tap Add line.
The price comes from your rate card.
A custom line¶
For anything that isn't on your rate card.
- Enter the Item name.
- Enter the Qty, such as 1, or a word like "job".
- Enter the Amount (ex VAT): the price for the whole line.
- Choose the Group.
- Add a Note (optional) if you like. It shows under the line on the quote.
- Tap Add line.
Discounts¶
There are two kinds. You can use both on one quote.
A discount on the whole quote¶
- Tap Add discount under the subtotal.
- Choose £ for an amount or % for a percentage.
- Enter the figure.
- Tap Apply.
To change it, tap Discount in the totals, change the figure and tap Apply. To take it off, tap Discount, then Remove.
A discount on chosen lines¶
Use this to take, say, 10% off the labour without touching the rest.
- Tap Bulk-discount lines above the lines.
- Tap each line you want. Or tap Select all. The count shows how many you've picked; Clear unpicks them all.
- Enter the percentage at the bottom, next to Reduce … selected lines by.
- Tap Apply discount.
This lowers the price of those lines. Your costs stay the same, so your margin on them goes down. Tap Cancel to leave without changing anything.
VAT and totals¶
The order is always: subtotal, then discount, then VAT at 20%, then total. If your business isn't VAT-registered there's no VAT line.
Your margin¶
The Margin card works out what you'll make on the lines that have a cost:
| Row | What it means |
|---|---|
| Paid (inc VAT) or Cost (ex VAT) | What the costed lines cost you. The name depends on how your business enters costs. |
| Revenue (ex VAT) | What you charge for those lines, without VAT, before any discount on the whole quote |
| Profit | Revenue minus cost, less those lines' share of any discount on the whole quote |
| Markup % | Profit as a share of cost: what you've added on top |
| Margin % | Profit as a share of revenue: what you keep from the price |
Lines without a cost are left out of these figures. The card tells you how many.
If the card says there are no costs on this quote yet, add costs to your rate card. New quotes will then show a margin.
Your markup on this quote¶
If your business prices from its costs, the Markup on this quote slider at the bottom of the Margin card moves the price of every line that has a cost.
- Drag the slider, or tab to it and use the arrow keys. The figure beside it shows the markup, and the line underneath shows the margin it works out at.
- Let go. A moment later every line with a cost is re-priced at that markup, and the totals update.
Lines without a cost keep their price, including lines you've priced by hand. The slider starts at your usual markup from Settings, and remembers where you left it on each quote. Once the quote is signed off, the slider is fixed.
Proposal display¶
This decides how prices show on this quote's proposal. Your usual choices come from Settings, and the card says Inherits default while you're using them.
To change them for this quote only, choose from:
- Detail level: Full breakdown, Summary by group, Single price or Scope only.
- VAT display: Ex-VAT primary, Inc-VAT only or Inc-VAT primary.
- Quantities column: Show quantities or Hide quantities.
Pick Inherit default in any box to go back to your usual choice, or tap Reset to default to put them all back. What each choice looks like is on The proposal and sending it.
Refine with AI¶
Refine is a short chat that checks the quote with you before you sign off. Use it when you want a second pair of eyes.
- Tap Refine with AI at the top of the quote. The AI quote check opens.
- QuoteSite asks about a few things worth checking, such as a missing line or an item with no price. The counter at the top shows how far through you are.
- Tap one of the suggested answers. QuoteSite makes the change and asks the next question.
- When the questions are done, type anything else you want added or changed, and tap send. QuoteSite suggests a change as a button that says what it will do and what it will cost, for example Add Labour day · 2 days · £370.00. Nothing changes until you tap it. Tap Leave it to keep the quote as it is.
- Tap No, that's everything when you're finished. It tells you how many changes it made.
- Tap Back to quote.
Close panel at the top takes you back to the quote at any time. If you come back later, Refine picks up where you left off.
On a wide computer screen you can see the quote lines beside the chat.
Refine never makes up a price. Anything it adds is priced from your rate card; anything that isn't on your rate card goes on at £0 with Needs a price, for you to price on the quote. A new price for a line only ever comes from a figure you typed, such as "call the paving £650". Once you put a price on a flagged line, its Needs a price note comes off by itself.
The totals beside the chat are the same as on the quote, discount included.
Check after refining
Refine can add, remove and re-price lines. Go back over the quote before you sign off.
Sign off¶
- Read every line and the totals.
- In Review & approve, tick I've reviewed this quote and the figures are correct.
- The card changes to Quote approved.
- Tap Continue to proposal. See The proposal and sending it.
After sign-off the quote is locked¶
- Lines, discounts, margin and proposal display can't be changed. The lines show Approved — lines are locked.
- Refine with AI is greyed out.
- Preview proposal works.
To change something:
- Tap Unapprove & edit.
- Make the change.
- Tick the sign-off box again.
Once the quote is marked accepted, the figures are final. Unapprove & edit goes away and the quote can't be changed any more.
Won, lost and done¶
Once the quote has been sent, a Job lifecycle card appears with its status. Use it to record what the customer decided.
| Status | Buttons you'll see |
|---|---|
| Sent | Mark as accepted; Mark as lost |
| Accepted | Mark as completed; Move back to sent |
| Lost or Completed | Reactivate (back to sent) |
To mark a quote as lost:
- Tap Mark as lost.
- Type a Reason (optional), such as "Went with a cheaper quote".
- Tap Confirm lost.
Archive a quote¶
Archive puts a sent quote away so it no longer shows in your Quotes list. It keeps everything. To bring it back, open it from the client's page and tap Restore from archive. See Quotes and clients.
With job management¶
Job management is optional. If you don't see Start job and want it, ask us to switch it on.
| Status | Extra buttons |
|---|---|
| Accepted | Start job, and Open job workspace → |
| In progress | Back to accepted, and Open job workspace →. You complete the job from Close out in the job workspace. |
| Completed | Open job workspace → |
See Running a job.
Without job management, a job in progress
If a job is In progress but your business doesn't use job management, the card shows Mark as completed and Back to accepted.
Related¶
- Start a survey: how the draft is made
- The proposal and sending it: the next step
- Rate card and pricing: where prices and costs come from